EJCDC 2016 D-940 is an all-new document for the Owner and Design-Builder’s use in authorizing changes in the Owner/Design-Builder contract before the parties have reached agreement on the effect on price, time, or both. This document is similar EJCDC C-940 (for design-bid-build) but is specific to design-build project delivery. Using EJCDC D-940 in design-build brings improved clarity to administering changes to a design-build contract.
“D-505 Standard Form of Subagreement between Design/Builder and Engineer for Design Professional Services” has been added to your cart. View cart
D-940 Work Change Directive
$78.00
Related products
-
D-800 Guide to the Preparation of Supplementary Conditions
$114.00 Add to cart -
D-525 Standard Form of Agreement between Owner and Design/Builder on the Basis of Cost Plus
$176.00 Add to cart -
D-001 — Commentary on the 2016 Design-Build Documents.
$0.00 Add to cart -
D-500 Standard Form of Agreement between Owner and Owner’s Consultant for Design Professional Services on Design/Build Projects
$176.00 Add to cart -
D-505 Standard Form of Subagreement between Design/Builder and Engineer for Design Professional Services
$176.00 Add to cart